785
Gdynia Maritime University, apart of Szczecin
Maritime University, was asked to prepare an
expertise of navigational approach and future
functionality moderniz ed Szczecinskie and Wislane
quaysinInnerGdanskPort(Fig.6).
Similar requirement received parallel Szczecin
MaritimeUniversity.
PolishOilConcern,OrlenownedoldpartofPort
(CPN‐3) with
old tanks and shore equipment and
intenttoadoptpiertodischargingoperationofcostal
tankers up to 20000 DWT (Fig. 7). Research content
optimization of vessel accepted for berthing, safety
enter to port condition of berthing, shifting and
mooringoperation(Fig.8).
All existing mooring equipment will be
eliminated, new turning circle with diameter 330 m
replaceexisting300mcircle.Conditionsforpiloting,
using tugs and berthing operations were prepared.
Optimaldistributionofpollardberthequipmentwere
calculated.
Orlenisreadytoestablishanti‐pollutionsystem.
Figure7. Typical coastal tanker used for simulation of
berthingoperation
Figure8. Berthing of analyzed tankers (20000 and 28000
DWT)inNewSzczecinskieandWislanequays[2]
Experiment on Simulator NaviTrainer 5000
cooperatingwithSimulatorNaviSailor4000(Transas)
helps to pass 42 passages done by me and Capt.
Weintrit (Fig. 9). General observation for
manoeuvring in different conditions (direction of
wind, waving) were shown. Certainly pilots and
safetyofficersdonotlikenewideasandconcepts,but
after
the discussion and giving the guarantee of
protection of new quay, trained personnel,
monitoring from shore and water side, etc. They
shortly became more friendly for proposed ideas
(Fig.10).
Figure9. Picture of simulators passage and manoeuvring
operationstoapproachSzczecinskieandWislanequays[2]
Figure10.Differentsituationswereanalyzedwiththehelp
ofsimulatorNaviTrainer5000ofTransas
3 CONCLUSION
Above paper was prepared in 2016 for TransNav
2017. All presented projects were taken in
consideration and finally were adopted by Port of
Gdansk authority for further realization. Projects
followsexistingdevelopmentdocumentspreparedby
nationalandlocalauthorities.
DCT‐2 is practically completed and the biggest
containervessels
ofcapacity21000TEUareberthing
everyweekinnewDCTpier(project1).
PERN Oils Strategical Base is under construction
inherfinalstage(project2).
ThemostfuturalprojectofOutsidePortisactually
morerealisticandclosertoinitialprojectwork.